Factory-direct since 1999 Human Hair Industry Park, Ligezhuang, Jiaozhou, Qingdao, ChinaWholesale enquiries: +86 152 7524 9803
Request price list
November 10, 2026

The spec sheet is the contract: nine lines that decide whether a reorder matches

A specification that cannot be measured cannot be enforced. These nine lines, written with tolerances and a measurement method, are what turn a first order into a repeatable product.

Why a sheet beats a sample

A sample shows one piece. A sheet shows every piece, and — more importantly — it is the only document that lets two people disagree about a shipment without arguing about taste.

Most disputes between a buyer and a factory are not about honesty. They are about a specification that was never written precisely enough to be broken.

The nine lines

These are the nine that decide whether the second order looks like the first. Write them once, per model, and attach them to every order.

One — hair origin, stated per order. Not “European” or “premium”. The source described in the same words on the sheet and on the invoice.

Two — material and cuticle state. Human hair, cuticle aligned or cuticle stripped, single or double drawn. If it is a blend, say the proportion.

Three — construction. Hand-tied crown, machine wefts, silk base, lace front, band. This is the line that most often goes missing, and the one that changes the price most.

Four — base or lace specification. Lace type and tint, silk panel size, knot type at the hairline — single or double. A hairline is not a detail; it is the part everyone looks at.

Five — length, and how it is measured. State the method: from the crown, hair hanging naturally, to the longest tip. A 22-inch piece measured from the nape is a 20-inch piece measured from the crown.

Six — density, and where it is measured. Density given as a percentage is only meaningful if the measurement point is fixed. Say whether it is taken at the crown, the hairline, or averaged, and give a tolerance.

Seven — cap measurements. Circumference, front hairline to nape, ear to ear. Three numbers, not a letter. A “medium” from one factory is not a “medium” from another.

Eight — colour reference. A code plus a physical reference: approved swatch, retained sample, or a specified lamp for comparison. “Natural brown” is not a colour reference.

Nine — packing and labelling. How the piece is boxed, what is written on the box, what travels inside it. This is the line buyers leave to the end and then discover matters when a shipment arrives unlabelled and has to be unpacked to be identified.

Tolerances do the work

A specification without a tolerance is a wish. Each of the nine lines needs a number attached to its acceptable variance.

Half an inch on length. A quarter inch on circumference. One density step. Two shades on the colour ring. Whatever the numbers are, they must be agreed before production and written down, because “close enough” is decided by whoever is holding the piece at the time.

The purpose is not to trap the factory. It is to give both sides a shared definition of a pass, so a shipment can be accepted in an afternoon rather than debated for a month.

The batch record

Ask what is kept against the order number.

At minimum: the approved specification, the colour reference, the measurements recorded at finishing, and who signed the inspection. With that, a reorder can be matched to the original rather than to its name.

Without it, the second order is matched to whatever the factory remembers, or to the most recent piece of the same model — which may have been made for someone else, to a different sheet.

What a weak sheet looks like

Four signs, all common:

  • Adjectives instead of measurements: “high quality”, “natural look”, “premium lace”.
  • A specification that describes the model in general rather than this order in particular.
  • No tolerance on any line, which means every line is arguable.
  • A sheet that changes between quotation and invoice without a note saying what changed and who agreed.

Keep your own copy, annotated

The sheet is only useful if the copy you hold is the copy that was made.

Keep the approved version, the date it was approved, the sample it refers to, and a note of anything agreed afterwards by email. When a shipment arrives, the inspection compares the goods to the sheet — not to a memory of the meeting.

This is dull work. It is also the difference between a supplier relationship that survives its first problem and one that ends at it.

More in this series

This is one of ten notes on buying sheitels wholesale, written for buyers who have to defend the decision later. The three below pick up where this one stops.